Data Center Project Engineer, Data Center Construction
Culpeper, United States of AmericaOn-siteFull-timeMid · 2+ yearsH1B likely
About this role
As a Data Center Project Engineer, you will be a part of a creative, diverse team tasked with solving fascinating problems constructing Amazon Data Centers. Our data centers are industry examples of energy efficient, cost-effective designs. You will work alongside partner teams such as Operations, Networking, Controls, Security, and Commissioning to build Data Centers that directly support our Customers.
As our Data Center Project Engineer, you will support the teams that build some of the most interesting electrical and mechanical systems in the world. You will be on the construction site, daily interacting with the construction managers and stakeholders and be directly responsible for supporting the fast, high-quality delivery of our data center construction.
The Data Center Project Engineer will be part of the onsite Construction Management team and will own the communication coordination with our vendors, information workflow, and coordination of document management including requests for information (RFI), change orders, report, and schedule updates.
At Amazon, we are all Owners and leverage unique opportunities presented to us by owning everything from the design review to construction bidding to construction execution and final hand-off to our customers. We are a diverse, upbeat, creative, team of engineers and managers working on a daily basis to develop innovative data centers for our Customers.
This position requires that the candidate selected be a US citizen.
Key job responsibilities
The Data Center Project Engineer will be responsible for:
- Establishing communication and coordination across a data center region’s general contractors, stakeholders, and internal teams. Example includes sending out region wide changes to construction trailer setup, site access procedures, or location to access documents.
- Maintain a tracking system for design changes, RFI’s (requests for information), and change orders and dashboard and track this information for regional leadership review. Include tracking status of priority and due dates.
- Requesting and reviewing MOPs (Method of Procedure) for proper detail, necessity, and risk.
- On-boarding new vendors for badging and orientation.
- Updating project management software with milestone dates, correspondence, and documents.
- Monitor delivery of owner furnished material to site.
- Compiling and storing construction data from vendors.
- Managing checklist including various checklists including substantial completion checks, safety, and quality.
About the team
AWS Infrastructure Services owns the design, planning, delivery, and operation of all AWS global infrastructure. In other words, we’re the people who keep the cloud running. We support all AWS data centers and all of the servers, storage, networking, power, and cooling equipment that ensure our customers have continual access to the innovation they rely on. We work on the most challenging problems, with thousands of variables impacting the supply chain — and we’re looking for talented people who want to help.
You’ll join a diverse team of software, hardware, and network engineers, supply chain specialists, security experts, operations managers, and other vital roles. You’ll collaborate with people across AWS to help us deliver the highest standards for safety and security while providing seemingly infinite capacity at the lowest possible cost for our customers. And you’ll experience an inclusive culture that welcomes bold ideas and empowers you to own them to completion.
Amazon Web Services (AWS) is the world’s most comprehensive and broadly adopted cloud platform. We pioneered cloud computing and never stopped innovating — that’s why customers from the most successful startups to Global 500 companies trust our robust suite of products and services to power their businesses.
Amazon values diverse experiences. Even if you do not meet all of the preferred qualifications and skills listed in the job description, we encourage candidates to apply. If your career is just starting, hasn’t followed a traditional path, or includes alternative experiences, don’t let it stop you from applying.
We value work-life harmony. Achieving success at work should never come at the expense of sacrifices at home, which is why we strive for flexibility as part of our working culture. When we feel supported in the workplace and at home, there’s nothing we can’t achieve in the cloud.
Here at AWS, it’s in our nature to learn and be curious. Our employee-led affinity groups foster a culture of inclusion that empower us to be proud of our differences. Ongoing events and learning experiences, including our Conversations on Race and Ethnicity (CORE) and AmazeCon conferences, inspire us to never stop embracing our uniqueness.
We’re continuously raising our performance bar as we strive to become Earth’s Best Employer. That’s why you’ll find endless knowledge-sharing, mentorship and other career-advancing resources here to help you develop into a better-rounded professional.
- AND 2+ years of relevant experience, OR 7+ years of relevant experience in lieu of degree
- 4+ years of relevant experience constructing and managing complex MEP systems, including large-scale power distribution/generation gear and cooling systems in mission-critical environments
- 4+ years of relevant experience managing general contractors and vendors, including RFP processes, bidding, change orders, quality control, and RFI/submittal tracking in construction project execution
- Experience in designing and managing construction of complex data centers, critical infrastructure, or large-scale MEP plants
- Proficiency in reading and interpreting construction specifications and drawings for all disciplines, and ability to create and maintain project documentation
- Knowledge of relevant building codes and regulations (e.g., Life Safety, BOCA, NFPA, NEC, OSHA) and certifications such as Professional Engineer (PE), LEED, or Certified Construction Manager (CCM)
- Demonstrated ability to value engineer, finding innovative solutions to reduce costs and duration without compromising quality and reliability
Amazon is an equal opportunity employer and does not discriminate on the basis of protected veteran status, disability, or other legally protected status.
Our inclusive culture empowers Amazonians to deliver the best results for our customers. If you have a disability and need a workplace accommodation or adjustment during the application and hiring process, including support for the interview or onboarding process, please visit https://amazon.jobs/content/en/how-we-hire/accommodations for more information. If the country/region you’re applying in isn’t listed, please contact your Recruiting Partner.
USA, VA, Culpeper - 96,000.00 - 166,300.00 USD annually
As our Data Center Project Engineer, you will support the teams that build some of the most interesting electrical and mechanical systems in the world. You will be on the construction site, daily interacting with the construction managers and stakeholders and be directly responsible for supporting the fast, high-quality delivery of our data center construction.
The Data Center Project Engineer will be part of the onsite Construction Management team and will own the communication coordination with our vendors, information workflow, and coordination of document management including requests for information (RFI), change orders, report, and schedule updates.
At Amazon, we are all Owners and leverage unique opportunities presented to us by owning everything from the design review to construction bidding to construction execution and final hand-off to our customers. We are a diverse, upbeat, creative, team of engineers and managers working on a daily basis to develop innovative data centers for our Customers.
This position requires that the candidate selected be a US citizen.
Key job responsibilities
The Data Center Project Engineer will be responsible for:
- Establishing communication and coordination across a data center region’s general contractors, stakeholders, and internal teams. Example includes sending out region wide changes to construction trailer setup, site access procedures, or location to access documents.
- Maintain a tracking system for design changes, RFI’s (requests for information), and change orders and dashboard and track this information for regional leadership review. Include tracking status of priority and due dates.
- Requesting and reviewing MOPs (Method of Procedure) for proper detail, necessity, and risk.
- On-boarding new vendors for badging and orientation.
- Updating project management software with milestone dates, correspondence, and documents.
- Monitor delivery of owner furnished material to site.
- Compiling and storing construction data from vendors.
- Managing checklist including various checklists including substantial completion checks, safety, and quality.
About the team
AWS Infrastructure Services owns the design, planning, delivery, and operation of all AWS global infrastructure. In other words, we’re the people who keep the cloud running. We support all AWS data centers and all of the servers, storage, networking, power, and cooling equipment that ensure our customers have continual access to the innovation they rely on. We work on the most challenging problems, with thousands of variables impacting the supply chain — and we’re looking for talented people who want to help.
You’ll join a diverse team of software, hardware, and network engineers, supply chain specialists, security experts, operations managers, and other vital roles. You’ll collaborate with people across AWS to help us deliver the highest standards for safety and security while providing seemingly infinite capacity at the lowest possible cost for our customers. And you’ll experience an inclusive culture that welcomes bold ideas and empowers you to own them to completion.
Amazon Web Services (AWS) is the world’s most comprehensive and broadly adopted cloud platform. We pioneered cloud computing and never stopped innovating — that’s why customers from the most successful startups to Global 500 companies trust our robust suite of products and services to power their businesses.
Amazon values diverse experiences. Even if you do not meet all of the preferred qualifications and skills listed in the job description, we encourage candidates to apply. If your career is just starting, hasn’t followed a traditional path, or includes alternative experiences, don’t let it stop you from applying.
We value work-life harmony. Achieving success at work should never come at the expense of sacrifices at home, which is why we strive for flexibility as part of our working culture. When we feel supported in the workplace and at home, there’s nothing we can’t achieve in the cloud.
Here at AWS, it’s in our nature to learn and be curious. Our employee-led affinity groups foster a culture of inclusion that empower us to be proud of our differences. Ongoing events and learning experiences, including our Conversations on Race and Ethnicity (CORE) and AmazeCon conferences, inspire us to never stop embracing our uniqueness.
We’re continuously raising our performance bar as we strive to become Earth’s Best Employer. That’s why you’ll find endless knowledge-sharing, mentorship and other career-advancing resources here to help you develop into a better-rounded professional.
Basic Qualifications
- Bachelor's degree in Electrical Engineering, Mechanical Engineering, or a related field- AND 2+ years of relevant experience, OR 7+ years of relevant experience in lieu of degree
- 4+ years of relevant experience constructing and managing complex MEP systems, including large-scale power distribution/generation gear and cooling systems in mission-critical environments
- 4+ years of relevant experience managing general contractors and vendors, including RFP processes, bidding, change orders, quality control, and RFI/submittal tracking in construction project execution
Preferred Qualifications
- Strong understanding of data center system-level architecture, including electrical (e.g., switch gear, UPS, transformers) and mechanical (cooling systems) engineering principles- Experience in designing and managing construction of complex data centers, critical infrastructure, or large-scale MEP plants
- Proficiency in reading and interpreting construction specifications and drawings for all disciplines, and ability to create and maintain project documentation
- Knowledge of relevant building codes and regulations (e.g., Life Safety, BOCA, NFPA, NEC, OSHA) and certifications such as Professional Engineer (PE), LEED, or Certified Construction Manager (CCM)
- Demonstrated ability to value engineer, finding innovative solutions to reduce costs and duration without compromising quality and reliability
Amazon is an equal opportunity employer and does not discriminate on the basis of protected veteran status, disability, or other legally protected status.
Our inclusive culture empowers Amazonians to deliver the best results for our customers. If you have a disability and need a workplace accommodation or adjustment during the application and hiring process, including support for the interview or onboarding process, please visit https://amazon.jobs/content/en/how-we-hire/accommodations for more information. If the country/region you’re applying in isn’t listed, please contact your Recruiting Partner.
The base salary range for this position is listed below. Your Amazon package will include sign-on payments and restricted stock units (RSUs). Final compensation will be determined based on factors including experience, qualifications, and location. Amazon also offers comprehensive benefits including health insurance (medical, dental, vision, prescription, Basic Life & AD&D insurance and option for Supplemental life plans, EAP, Mental Health Support, Medical Advice Line, Flexible Spending Accounts, Adoption and Surrogacy Reimbursement coverage), 401(k) matching, paid time off, and parental leave. Learn more about our benefits at https://amazon.jobs/en/benefits.
USA, VA, Culpeper - 96,000.00 - 166,300.00 USD annually
