NextRaise Logo
NextRaise
JobsDiscover rolesJob TrackerTrack applied positionsMy ResumesBuild & optimize resumes
Tools
Job Match AnalyzerPaste JD, get fit scoreATS ScoreScan for ATS issues
Chrome Extension
ResumesJobsProfile
Jobs / Field Service Engineer in United States of America
16 days ago
Fsttechnicalservices·16 days ago
16 days ago

Senior Electrical Commissioning Project Engineer-Data Center Construction

Atlanta, United States of AmericaMid · 5-8 years

Sign up free to see how well your resume matches this role.

About this role

Lead the Systems That Power Critical Infrastructure 

At FST Technical Services, we ensure the most complex facilities in the world perform exactly as designed. From data centers to advanced manufacturing environments, our work sits at the intersection of engineering precision and real-world execution. 
 
We are looking for a Senior Electrical Commissioning Project Engineer who can lead from the front, solve complex technical challenges, and drive commissioning outcomes in high-stakes environments. 

Why This Role Stands Out 

This is not a checklist-driven commissioning role. 
 
This is a position for someone who: 
• Owns outcomes, not just tasks 
• Understands systems holistically, not in silos 
• Can operate independently while leading others 
 
You will play a direct role in ensuring critical systems are designed correctly, installed properly, and perform under real-world conditions. 

What You’ll Do 

Project Leadership & Execution 
• Lead commissioning activities across the full project lifecycle 
• Execute and oversee functional testing, factory witness testing, and on-site validation 
• Manage multiple assignments while maintaining schedule, budget, and quality expectations 
• Interpret contract documents to identify risks and opportunities 
 
Technical Expertise & Problem Solving 
• Evaluate electrical distribution systems and building system interconnectivity 
• Troubleshoot system performance issues in real time 
• Review design documentation and submittals 
 
Client & Stakeholder Engagement 
• Lead commissioning meetings and communicate findings 
• Serve as a trusted partner to clients and contractors 
 
Operational Contributions 
• Complete field reports, documentation, and time management 
• Support scheduling and revenue targets 
 
Team Development 
• Mentor junior engineers and support training initiatives 

What You Bring 

Core Qualifications 
• Electrical Engineering degree or Qualified Electrician background 
• 7+ years in electrical systems OR 3+ years commissioning 
• Data center or mission-critical experience 
 
Technical Capabilities 
• Experience with electrical distribution, HVAC systems, controls, fire alarm, and automation 
• Ability to read construction drawings and specifications 
 
Professional Skills 
• Strong analytical and communication skills 
• Ability to lead meetings and manage multiple priorities 
 
Physical Requirements 
• Ability to work in field environments, climb ladders, and lift ~30 lbs 
 
Preferred 
• EIT, CEM, LEED, OSHA 30, BIM experience 

Travel Requirements 

Regular travel to project sites with potential for broader U.S. travel. Must be able to work on-site as required. 

Why FST 

At FST, you are part of a team that values execution, accountability, and expertise. Strong performers are recognized, and engineers have opportunities to grow into leadership roles. 

Salary range: $130,000-$170,000 - based on experience 

H1B sponsor likely
AI tools
Apply faster with autofillThe NextRaise extension autofills your application in one click.Get the extension

Similar jobs

  • Field Service Technician 4 at xylemMira Loma, United States of America
  • Project Engineer II - Water Construction at walshgroupCA_San Francisco_223175, United States of America
  • Project Engineer 1 at sunbeltrentalsElkridge MD 21075
  • Construction Engineer - Aerospace Materials Manufacturing at ppgMojave Plant, United States of America
  • Field Service Technician- Walmart - Clarksville, AR at plugpowerClarksville, United States of America
  • Field Service Technician- Nashville, TN at iqviaNashville, United States of America