NextRaiseNextRaiseFind jobs
Sign inSign up free
Jobs / Production Planner / Scheduler in United States of America
4 months ago
Apply with autofill
Apply with autofill
Faithtechnologies·4 months ago
4 months ago

Construction Scheduler - Monroe

Nationwide, United States of AmericaFull-timeHybridSenior · 10+ yearsProduction Planner / Scheduler

Sign up free to see how well your resume matches this role.

Boost your chances at faithtechnologies

How you compare FREE

?
Your scoreYour score: not yet known
→
37
Top 10%Top 10%: 37 out of 100

Top 10% of NextRaise users matched against Production Planner / Scheduler roles in United States.

Must-have skills for this role

  • electrical contracting
  • mep coordination
  • project controls
  • scheduling

PDF or DOCX · no account needed

Apply faster with autofill FREEThe NextRaise extension autofills your application in one click.careers.example.com/applyAutofillingFull namePriya SharmaEmailpriya.sharma@example.comPhone+49 30 1234567LocationBerlGet the extension

About this role

You’ve discovered something special. A company that cares. Cares about leading the way in construction, engineering, manufacturing and renewable energy. Cares about redefining how energy is designed, applied and consumed. Cares about thoughtfully growing to meet market demands. And ─ as “one of the Healthiest 100 Workplaces in America” ─ is focused on the mind/body/soul of team members through our Culture of Care.

The purpose of this position is to plan and execute the Project Controls requirements for a project. This role is responsible for providing technical and administrative direction, coordination, evaluation, training, and coaching to a team of Project Controls specialists. This position serves as Control Team Leader/Project Controls Manager on medium and large-sized projects or as a Subject Manager Expert (SME) for the entire Project Controls Team. Acting as a key resource on a project team, the role will require collaboration at all levels.

MINIMUM REQUIREMENTS

Education: Bachelor’s Degree

Experience: 10 years of electrical contracting experience or MEP coordination

Travel: Up to 50%

Work Schedule: Typical work hours are between 7:00 a.m. and 5:00 p.m. Monday – Friday. However, work may be performed at any time on any day of the week to meet business needs.

  

KEY RESPONSIBILITIES

  • Develop and implement a project controls plan as part of the Project Execution Plan (PEP) for the project execution.
  • Plan and organize the setup of project baseline in project controls system, and implement a plan to track against the baseline on a regular basis.
  • Develop cost, schedule, and commercial baseline.
  • Responsible for providing technical and administrative direction, coordination, evaluation, training and coaching to a team of Project Controls specialists.
  • Analyze variances in cost and schedule performance against the plan, and communicate the reasons for the issuance of variance and proposed mitigation plans to Project Management
  • Supervise the implementation of Work Breakdown and Project Coding Structures for control and integrity of work to be performed as defined by the contract
  • Performs other related duties as required and assigned.

The job description and responsibilities described are intended to provide guidelines for job expectations and the employee's ability to perform the position described. It is not intended to be construed as an exhaustive list of all functions, responsibilities, skills and abilities. Additional functions and requirements may be assigned by supervisors as deemed appropriate.

How Does FTI Give YOU the Chance to Thrive?

If you’re energized by new challenges, FTI provides you with many opportunities. Joining FTI opens doors to redefine what’s possible for your future.

Once you’re a team member, you’re supported and provided with the knowledge and resources to achieve your career goals with FTI. You’re officially in the driver’s seat of your career, and FTI’s career development and continued education programs give you opportunities to position yourself for success.

FTI is a “merit to the core” organization. We recognize and reward top performers, offering competitive, merit-based compensation, career path development and a flexible and robust benefits package.

 

Benefits are the Game-Changer

We provide industry-leading benefits as an investment in the lives of team members and their families. You’re invited to review the full list of FTI benefits available to regular/full-time team members. Start here. Grow here. Succeed here. If you’re ready to learn more about your career with FTI, apply today!

Faith Technologies, Inc. is an Equal Opportunity Employer – veterans/disabled.

Company

Faithtechnologies
Nationwide, United States of America

Company facts come from this company's own listings. We only show what the postings themselves carry.

Sourced from Faithtechnologies's careers site·first seen 26 Aug 2026·last verified 9 Sept 2026·How we source jobs

Similar jobs

  • Program Planning and Scheduling Analyst at ngcLayton, United States of America–match not yet calculated
  • Senior Scheduler – Natural Gas at Marathon PetroleumHouston, United States of America–match not yet calculated
  • Material Planner (1st shift) at Eaton (India)Fayetteville, United States of America–match not yet calculated
  • Teamleiter (m/w/d) Produktion in der Halbleiterbranche - befristet at vishayHeilbronn, United States of America–match not yet calculated
  • Manufacturing Planner Associate Manager at Lockheed MartinChelmsford, United States of America–match not yet calculated

Browse more jobs

  • Production Planner / Scheduler jobs in United States
  • Production Supervisor jobs in United States
  • Operations Manager jobs in United States
  • Plant Manager jobs in United States
  • Production Planner / Scheduler jobs in Germany
  • Production Planner / Scheduler jobs in Canada