NextRaiseNextRaiseFind jobs
Sign inSign up free
Jobs / Construction Estimator in United States of America
26 days ago
Apply with autofill
Apply with autofill
Oracle·SaaS·26 days ago
26 days ago

Data Center Construction Cost Estimator (Nashville, TN)

Nashville, United States of AmericaMid · 2-5 yearsConstruction Estimator

Sign up free to see how well your resume matches this role.

Boost your chances at Oracle

How you compare FREE

?
Your scoreYour score: not yet known
→
19
Top 10%Top 10%: 19 out of 100

Top 10% of NextRaise users matched against Construction Estimator roles in United States.

Must-have skills for this role

  • quantity takeoffs
  • cost estimating
  • cost management
  • bim

PDF or DOCX · no account needed

Apply faster with autofill FREEThe NextRaise extension autofills your application in one click.careers.example.com/applyAutofillingFull namePriya SharmaEmailpriya.sharma@example.comPhone+49 30 1234567LocationBerlGet the extension

What you'll do

  • Develop construction cost estimates for assigned data center projects and work packages at conceptual, design-development, procurement, and detailed-design stages.
  • Prepare and validate quantity takeoffs from engineering drawings, BIM models, P&IDs, one-line diagrams, equipment lists, schedules, specifications, design narratives, and scope documents.
  • Analyze labor, material, equipment, subcontract, general conditions, indirect costs, escalation, allowances, and contingency to produce accurate and transparent estimate build-ups.
  • Structure estimates using the approved cost breakdown structure (CBS) and work breakdown structure (WBS), maintaining traceability from scope and quantities to budget lines and work packages.
  • Incorporate labor productivity, crew composition, construction sequencing, schedule constraints, site logistics, regional market conditions, and other project-specific execution factors.
  • Collaborate with Design and Engineering teams to validate scope, system assumptions, quantities, equipment requirements, specifications, and interfaces between disciplines.
  • Prepare Basis of Estimate packages documenting scope, design basis, inclusions, exclusions, assumptions, allowances, risks, estimate methodology, source data, and qualifications.
  • Identify cost risks, scope gaps, quantity concerns, constructability issues, and value-engineering opportunities and communicate them to senior estimators and project stakeholders.
  • Review contractor, subcontractor, vendor, consultant, and colocation-provider proposals for completeness, scope alignment, quantities, pricing accuracy, exclusions, qualifications, and risk considerations.
  • Prepare bid-leveling, proposal-normalization, scope-reconciliation, and pricing-comparison analyses using a consistent CBS/WBS and estimate basis.
  • Support preparation of procurement and bid packages, cost baselines, and budget allocations for major equipment, bulk materials, construction services, and assigned work packages.
  • Contribute to should-cost analyses and independent cost checks using internal models, historical data, benchmarks, regional labor assumptions, and current market information.

Summarised by NextRaise from the employer’s description, which follows in full below.

Full description from employer

The Global Program Controls organization provides governance, reporting, controls processes, cost management support, and portfolio visibility to help Oracle Cloud Infrastructure deliver global data center programs with greater consistency, transparency, and execution discipline.  

Oracle is seeking a Construction Cost Estimator (IC3) to support data center development, build-out, and infrastructure delivery across multiple regions. This is a hands-on estimating role responsible for preparing conceptual, budgetary, and detailed construction estimates across civil, structural, architectural, mechanical, electrical, plumbing, fire protection, controls, low-voltage, security, network, and site-infrastructure scopes.

 

The Construction Cost Estimator will develop assigned estimates and work packages using established methods and governance, partnering with senior estimators, Design, Engineering, Construction, Project Controls, Procurement, Finance, and external cost partners. The role translates drawings, models, system information, market pricing, and construction assumptions into traceable quantity takeoffs, transparent cost models, Basis of Estimate documentation, and decision-support materials.

 

Estimate Development and Quantity Takeoffs

 

  • Develop construction cost estimates for assigned data center projects and work packages at conceptual, design-development, procurement, and detailed-design stages.

  • Prepare and validate quantity takeoffs from engineering drawings, BIM models, P&IDs, one-line diagrams, equipment lists, schedules, specifications, design narratives, and scope documents.

  • Analyze labor, material, equipment, subcontract, general conditions, indirect costs, escalation, allowances, and contingency to produce accurate and transparent estimate build-ups.

  • Structure estimates using the approved cost breakdown structure (CBS) and work breakdown structure (WBS), maintaining traceability from scope and quantities to budget lines and work packages.

  • Incorporate labor productivity, crew composition, construction sequencing, schedule constraints, site logistics, regional market conditions, and other project-specific execution factors.

  • Collaborate with Design and Engineering teams to validate scope, system assumptions, quantities, equipment requirements, specifications, and interfaces between disciplines.

  • Prepare Basis of Estimate packages documenting scope, design basis, inclusions, exclusions, assumptions, allowances, risks, estimate methodology, source data, and qualifications.

  • Identify cost risks, scope gaps, quantity concerns, constructability issues, and value-engineering opportunities and communicate them to senior estimators and project stakeholders.

 

Pricing Review and Commercial Support

 

  • Review contractor, subcontractor, vendor, consultant, and colocation-provider proposals for completeness, scope alignment, quantities, pricing accuracy, exclusions, qualifications, and risk considerations.

  • Prepare bid-leveling, proposal-normalization, scope-reconciliation, and pricing-comparison analyses using a consistent CBS/WBS and estimate basis.

  • Support preparation of procurement and bid packages, cost baselines, and budget allocations for major equipment, bulk materials, construction services, and assigned work packages.

  • Contribute to should-cost analyses and independent cost checks using internal models, historical data, benchmarks, regional labor assumptions, and current market information.

  • Support cost-reconciliation and negotiation meetings by preparing analyses, documenting clarifications and agreed assumptions, tracking open items, and escalating material issues to senior estimating or commercial leads.

  • Assist with change-order and design-change evaluations by validating quantities, pricing, labor assumptions, markups, schedule effects, and alignment with the approved scope and budget.

     

Project Controls and Reporting Support

 

  • Support development and maintenance of project cost baselines, budget allocations, cost plans, and estimate handoffs to Project Controls and Delivery teams.

  • Provide estimate-to-actual comparisons, cost variance analyses, trend information, forecast inputs, and change-impact assessments during project execution.

  • Maintain clear links between estimates, approved budgets, procurement packages, commitments, forecasts, and changes so cost movements can be explained and audited.

  • Prepare estimate summaries, cost reports, dashboards, review materials, and presentation content for Finance, project teams, and leadership review.

  • Present routine estimate findings, assumptions, cost drivers, and risks to project stakeholders and support senior estimators during complex or executive-level reviews.

     

Standards, Data and Collaboration

 

  • Develop and maintain cost databases, unit rates, benchmarking tools, productivity assumptions, and historical cost records for data center systems and construction scopes.

  • Compare estimates with awarded pricing, actual costs, contractor submissions, and change orders to improve future estimate quality and benchmark reliability.

  • Apply Oracle estimating standards, CBS/WBS requirements, documentation expectations, review procedures, and applicable industry best practices.

  • Validate estimate inputs, calculations, source references, version control, and supporting documentation before estimates are submitted for review.

  • Collaborate across Design, Engineering, Construction, Procurement, Commercial, Finance, Project Controls, Scheduling, Operations, contractors, consultants, and colocation providers.

  • Contribute practical improvements to estimating templates, tools, review checklists, cost reporting, and recurring team processes.

SaaS

Company

OracleSaaS
Nashville, United States of America

Company facts come from this company's own listings. We only show what the postings themselves carry.

Sourced from Oracle's careers site·first seen 8 Sept 2026·last verified 8 Sept 2026·How we source jobs

Similar jobs

  • Estimator at tindallSan Antonio, United States of America–match not yet calculated
  • Estimating Intern at superiorconstructionJacksonville, United States of America–match not yet calculated
  • Intern - PM/Estimator - Earthwork at veitusaNew Berlin, United States of America–match not yet calculated
  • Intern - PM/Estimator - Marine at veitusaRogers, United States of America–match not yet calculated
  • Auto Body Estimator at boydgroupDecatur Blvd, United States of America–match not yet calculated

Browse more jobs

  • Construction Estimator jobs in United States
  • Site Supervisor / Foreman jobs in United States
  • Construction Project Manager jobs in United States
  • Surveyor jobs in United States
  • Construction Estimator jobs in Germany
  • Construction Estimator jobs in Canada