NextRaiseNextRaiseFind jobs
Sign inSign up free
Jobs / Production Planner / Scheduler in United States of America
21 hours ago
Apply with autofill
Apply with autofill
VA
Vanir·21 hours ago
21 hours ago

Senior Regional Construction Scheduler

Los Angeles, United States of AmericaSenior · 5-8 yearsProduction Planner / Scheduler

Sign up free to see how well your resume matches this role.

Boost your chances at vanir

How you compare FREE

?
Your scoreYour score: not yet known
→
37
Top 10%Top 10%: 37 out of 100

Top 10% of NextRaise users matched against Production Planner / Scheduler roles in United States.

Must-have skills for this role

  • primavera p6
  • construction scheduling
  • cpm schedules
  • schedule forensics

PDF or DOCX · no account needed

Apply faster with autofill FREEThe NextRaise extension autofills your application in one click.careers.example.com/applyAutofillingFull namePriya SharmaEmailpriya.sharma@example.comPhone+49 30 1234567LocationBerlGet the extension

What you'll do

  • Report directly to the Senior Construction Manager of Scheduling and Estimating.
  • Provide various schedule-related reports for upper management to meet Key Performance Milestones.
  • Assist in the supervision of Project Schedulers to ensure project timelines are met and interface with OARs, Senior Project Managers and other site staff related to the review of CPM schedules.
  • Independently interpret and read detailed construction drawings (Architectural, Structural, Mechanical, Electrical, Plumbing, Civil, etc.) and develop a clear understanding of work scope.
  • Review Contractor P6 initial Baseline Construction Schedules and identify any missing scope, identify any missing logic or milestones, identify and analyze the critical path, review the required cost loading, and be able to provide written technical schedule review comments based on structured review templates.
  • Review multiple Contractor P6 Monthly schedule updates and provide written schedule review comments that document milestone schedule slippage, critical path activity slippage, and provide over-all schedule analysis based on structured review templates.
  • Perform schedule Time Impact Analysis by using the method of Windows Analysis while incorporating either contemporaneous and/or forensic schedule parameters in a detailed write-up.
  • Read drawings to determine if work is in or out of scope and understand terms and conditions of the contract to determine if any compensable or non-compensable time extensions have merit.
  • Effectively communicate with the project team regarding any schedule/progress related issues or concerns at regular schedule meetings.
  • Develop, maintain, and update various program schedules identifying relationships, logic, milestones, and constraints for construction projects.
  • Perform status updates for Program Schedules/Master Schedules on a regular basis.
  • Ensure proper use of Program-level standard codes, layouts and reports necessary to ensure data integrity.

What they're looking for

  • Graduation from a recognized college or university with a bachelor’s degree in construction management, engineering, architecture or any related field
  • OR Graduation from a recognized college or university with a bachelor’s degree in any course, but with additional four (4) years of experience in the duties to compensate for the required education.
  • Minimum ten (10) years full time paid professional experience in Construction Scheduling for an Owner or General Contractor, preferably in an educational facility or public works projects
  • Proficiency in Primavera Latest Version (P6 v19) and MS Office Suite
  • Excellent written and verbal communication skills
  • Superior organizational and planning skills
  • Understanding of theories, principles and practices of cost engineering, scheduling and schedule forensics

Summarised by NextRaise from the employer’s description, which follows in full below.

Full description from employer

About Vanir

Vanir is a proud minority- and woman-owned company, recognized as a national leader in program, project and construction management (PMCM) and real estate development. Since 1964, we have consistently exceeded client expectations. Ranked as a top PMCM firm by Engineering News-Record (ENR) for more than three decades, our award-winning team provides a full range of services to public and private sector clients in the aviation; healthcare; education (K-12 and higher); justice and essential services; science and technology; state and local government; transportation; water and wastewater; energy; and commercial, residential and nonprofit markets.

Job Description

Essential Duties & Responsibilities:

  • Report directly to the Senior Construction Manager of Scheduling and Estimating. Provide variousschedule-related reports for upper management to meet Key Performance Milestones.
  • Assist in the supervision of Project Schedulers to ensure project timelines are met and interface with OARs, Senior Project Managers and other site staff related to the review of CPM schedules.
  • Independently interpret and read detailed construction drawings (Architectural, Structural,Mechanical, Electrical, Plumbing, Civil, etc.) and develop a clear understanding of work scope.
  • Review Contractor P6 initial Baseline Construction Schedules and identify any missing scope, identify any missing logic or milestones, identify and analyze the critical path, review the required cost loading, and be able to provide written technical schedule review comments based onstructured review templates.
  • Review multiple Contractor P6 Monthly schedule updates and provide written schedule reviewcomments that document milestone schedule slippage, critical path activity slippage, and provideover-all schedule analysis based on structured review templates.
  • Perform schedule Time Impact Analysis by using the method of Windows Analysis whileincorporating either contemporaneous and/or forensic schedule parameters in a detailed write-up.
  • Read drawings to determine if work is in or out of scope and understand terms and conditions of the contract to determine if any compensable or non-compensable time extensions have merit.
  • Effectively communicate with the project team regarding any schedule/progress related issues orconcerns at regular schedule meetings.
  • Develop, maintain, and update various program schedules identifying relationships, logic, milestones, and constraints for construction projects.
  • Perform status updates for Program Schedules/Master Schedules on a regular basis.
  • Ensure proper use of Program-level standard codes, layouts and reports necessary to ensure dataintegrity.
  • Prepare reports as needed and directed by Senior Management.
  • Visit construction sites and attend meetings, as needed, and check the Contractor’s monthlyschedule progress.

 

Minimum Qualifications:

  • Graduation from a recognized college or university with a bachelor’s degree in constructionmanagement, engineering, architecture or any related field
    • OR Graduation from a recognized college or university with a bachelor’s degree in any course, but with additional four (4) years of experience in the duties to compensate forthe required education.
  • Minimum ten (10) years full time paid professional experience in Construction Scheduling for an Owner or General Contractor, preferably in an educational facility or public works projects
  • Proficiency in Primavera Latest Version (P6 v19) and MS Office Suite
  • Excellent written and verbal communication skills
  • Superior organizational and planning skills
  • Ability to build efficient working relationships with project teams and department staff
  • Understanding of theories, principles and practices of cost engineering, scheduling and scheduleforensics

Benefits

Vanir offers a comprehensive, competitive benefits package that includes 401(k) Savings with employer matching contributions, medical, dental, vision, health savings account (HSA) with employer contributions, life, AD&D and disability benefits, flexible spending account (FSA), voluntary benefits, Teladoc, pet insurance, paid time off, national employee assistance program (EAP) and employee referral program.

How to Apply

If you're interested in working for Vanir please visit our website to learn more and to apply online at www.vanir.com.

   

VEVRAA Federal Contractor

Request Priority Protected Veteran Referrals

EOE Minorities/Females/Protected Veterans/Disabled

 

Contact Email: careers@vanir.com

 

Persons with medical limitations may, with reasonable accommodations, be capable of performing the duties of this position. Such a determination must be made on an individual basis considering the person's limitations, the requirements of the position, and the company's ability to make reasonable accommodations to the person's limitations.

 

We Participate in E-Verify

 

Pursuant to the Ban The Box Act/Fair Chance Initiative, we will consider for employment qualified applicants with arrest and conviction records.

 

#LI-JB1

Posted Salary Range

USD $140,000.00 - USD $159,250.00 /Yr.

Company

VA
Vanir
Los Angeles, United States of America

Company facts come from this company's own listings. We only show what the postings themselves carry.

Sourced from Vanir's careers site·first seen 22 Sept 2026·last verified 22 Sept 2026·How we source jobs

Similar jobs

  • Neurosurgery Surgery Scheduler at rchMain Campus, United States of America–match not yet calculated
  • Scheduler at interiorlogicgroupRemote California–match not yet calculated
  • Scheduler I at stjudeMemphis, United States of America–match not yet calculated
  • Production Control Planner 2 - Machining at foxfactoryGainesville (Machine Shop), United States of America–match not yet calculated
  • Production Planner - Production/Manufacturing at foxfactoryGainesville, United States of America–match not yet calculated

Browse more jobs

  • Production Planner / Scheduler jobs in United States
  • Production Supervisor jobs in United States
  • Operations Manager jobs in United States
  • Plant Manager jobs in United States
  • Production Planner / Scheduler jobs in Germany
  • Production Planner / Scheduler jobs in United Kingdom