NextRaiseNextRaiseFind jobs
Sign inSign up free
Jobs / Electrical Project Engineer in United States of America
1 month ago
Apply with autofill
Apply with autofill
Fsttechnicalservices·1 month ago
1 month ago

Senior Electrical Commissioning Engineer - Data Center Construction

Los Angeles, United States of AmericaSenior · 5-8 yearsElectrical Project Engineer

Sign up free to see how well your resume matches this role.

Boost your chances at fsttechnicalservices

How you compare FREE

?
Your scoreYour score: not yet known
→
24
Top 10%Top 10%: 24 out of 100

Top 10% of NextRaise users matched against Electrical Project Engineer roles in United States.

PDF or DOCX · no account needed

Apply faster with autofill FREEThe NextRaise extension autofills your application in one click.careers.example.com/applyAutofillingFull namePriya SharmaEmailpriya.sharma@example.comPhone+49 30 1234567LocationBerlGet the extension

About this role

Lead the Systems That Power Critical Infrastructure 

At FST Technical Services, we ensure the most complex facilities in the world perform exactly as designed. From data centers to advanced manufacturing environments, our work sits at the intersection of engineering precision and real-world execution. 
 
We are looking for a Senior Electrical Commissioning Project Engineer who can lead from the front, solve complex technical challenges, and drive commissioning outcomes in high-stakes environments. 

Why This Role Stands Out 

This is not a checklist-driven commissioning role. 
 
This is a position for someone who: 
• Owns outcomes, not just tasks 
• Understands systems holistically, not in silos 
• Can operate independently while leading others 
 
You will play a direct role in ensuring critical systems are designed correctly, installed properly, and perform under real-world conditions. 

What You’ll Do 

Project Leadership & Execution 
• Lead commissioning activities across the full project lifecycle 
• Execute and oversee functional testing, factory witness testing, and on-site validation 
• Manage multiple assignments while maintaining schedule, budget, and quality expectations 
• Interpret contract documents to identify risks and opportunities 
 
Technical Expertise & Problem Solving 
• Evaluate electrical distribution systems and building system interconnectivity 
• Troubleshoot system performance issues in real time 
• Review design documentation and submittals 
 
Client & Stakeholder Engagement 
• Lead commissioning meetings and communicate findings 
• Serve as a trusted partner to clients and contractors 
 
Operational Contributions 
• Complete field reports, documentation, and time management 
• Support scheduling and revenue targets 
 
Team Development 
• Mentor junior engineers and support training initiatives 

What You Bring 

Core Qualifications 
• Electrical Engineering degree or Qualified Electrician background 
• 7+ years in electrical systems OR 3+ years commissioning 
• Data center or mission-critical experience 
 
Technical Capabilities 
• Experience with electrical distribution, HVAC systems, controls, fire alarm, and automation 
• Ability to read construction drawings and specifications 
 
Professional Skills 
• Strong analytical and communication skills 
• Ability to lead meetings and manage multiple priorities 
 
Physical Requirements 
• Ability to work in field environments, climb ladders, and lift ~30 lbs 
 
Preferred 
• EIT, CEM, LEED, OSHA 30, BIM experience 

Travel Requirements 

Regular travel to project sites with potential for broader U.S. travel. Must be able to work on-site as required. 

Why FST 

At FST, you are part of a team that values execution, accountability, and expertise. Strong performers are recognized, and engineers have opportunities to grow into leadership roles

Salary range: $130,000 to $180,000

Company

Fsttechnicalservices
Los Angeles, United States of America

Company facts come from this company's own listings. We only show what the postings themselves carry.

Sourced from Fsttechnicalservices's careers site·first seen 9 Aug 2026·last verified 8 Sept 2026·How we source jobs

Similar jobs

  • Senior- Supervising Commissioning Agent at syskahennessyNew York, United States of America–match not yet calculated
  • Quality Control & Commissioning Manager- Data Centres at turnertownsendCedar Rapids, United States of America–match not yet calculated
  • Technical Intern: Equipment Commissioning Support (Korean/English) at espaceArlington, United States of America–match not yet calculated
  • Lead Engineer, Commissioning- Substations at eversourceHooksett, United States of America–match not yet calculated
  • Ferrovial Webber Energy - Commissioning Manager at ferrovialMilan, United States of America–match not yet calculated

Browse more jobs

  • Electrical Project Engineer jobs in United States
  • Electrical Engineer jobs in United States
  • Power Distribution Engineer jobs in United States
  • Power Systems Engineer jobs in United States
  • Electrical Project Engineer jobs in Germany
  • Electrical Project Engineer jobs in United Kingdom